Bike Audit Team

Lansdale Active Transportation Plan

Phases

Phases overview
Phase 1: Survey Data Collection: Active Transportation Survey
Survey Data Collection: Active Transportation Survey
Phase 2: Audits: Walk and Bike
Audits: Walk and Bike

Audits: Walk and Bike

June 1, 2025 4:00 AM - September 2, 2025 4:00 AM

This phase collected information on the walking and biking environment in the borough. It included two audits: a walk audit and a bike audit.

WALK AUDIT

Measuring streetscape characteristics on Broad StreetWhites Road

The audit assessed conditions and characteristics of sidewalks, verges, crosswalks, accessibility features, pedestrian signalization, pedestrian clearance, and the presence of trees, on-street parking, and related elements.

MCPC and borough staff walked selected streets, recording data about the pedestrian network in the borough. This included an evaluation of both sides of selected street intersections, and an evaluation of intersections along the route. The focus area for the walk audit was Main Street, Broad Street, and the eastern section of Whites Road.

BIKE AUDIT

This 5-minute video shows us riding the pre-selected route around the borough to observe, discuss, and note bicycling and bike safety issues and opportunities.

Video excerpts from bike audit

During the bike audit, we recorded data on audit forms for (1) pre-selected intersections and (2) street segments (blocks).  Audit participants from the Active Transportation Plan Steering Committee met at Whites Road Park to review our plan before beginning our ride.

Upcoming and ongoing events

    0 events have loaded.
    No upcoming or ongoing events are currently scheduled.

    Past events

    1 event has loaded.